Estimate format for interior and construction work

By the Inbecto team · Updated

An estimate is a costed list of the work before you quote: each item with its quantity, unit, rate and amount, grouped by room or trade, with the total and the GST to expect. You use it to work out your price; the customer uses it to set a budget. It is not a bill and creates no GST to pay; the quotation and the invoice come after it.

Free, no sign-up. Filled with the sample below: change it to your own details. In the Excel file the amounts and totals are formulas.

When you need it

  • A customer asks for a rough budget before final drawings
  • You want to know your cost and margin before you quote
  • A bank or society asks for the cost of the work

What to include

Fields of the estimate format
FieldWhat goes in it
Project and siteWho it is for and where.
Estimate number and dateAnd how long it holds, such as 30 days.
Items by room or tradeDescription, quantity, unit, rate, amount.
Basis of each rateSay whether it includes material, labour, or both.
GST to expectShown separately, usually 18% on works contracts.
AssumptionsQuantities to be confirmed on site, brands assumed, what is left out.

Sample estimate format

ESTIMATE

2BHK renovation, approximate

Prepared by

Shree Windows & Interiors

Plot 18, Sector 37, Gurugram, Haryana 122001

GSTIN 06ABCPS1234K1Z8 · Phone 98110 00000

Prepared for

Sunita Rao

Flat 704, Palm Residency, Sector 49, Gurugram 122018

Estimate no.:
EST/26-27/019
Date:
14 Nov 2026
Valid for:
30 days
Sample estimate format lines
SrDescriptionQtyUnitRate (₹)Amount (₹)
1Remove old kitchen platform and floor tiles, cart away debris1Lot18,000.0018,000.00
2Vitrified floor tiles 2 × 2 ft, laid with adhesive650sq.ft120.0078,000.00
3Putty, primer and 2 coats emulsion on walls2,400sq.ft24.0057,600.00
4Gypsum false ceiling with cove, living room224sq.ft110.0024,640.00
5Modular kitchen, L-shape, base and wall units26rft2,600.0067,600.00
6Wardrobes with loft, two bedrooms114sq.ft1,400.001,59,600.00
7Rewiring with modular switches30Points600.0018,000.00
Estimated cost4,23,440.00
GST 18% (expected)76,219.20
Estimated total4,99,659.20

Assumptions

Quantities are from the floor plan and will be confirmed by site measurement.

Sample rates include material and labour. Appliances, light fittings and civil repairs are not included.

Prepared by

Checked by

Sample data, for illustration. Names, GSTINs and rates are made up.

Make this in Inbecto

Estimates

Inbecto's Estimates are your own cost sheets: material, labour and other costs on each line, with the markup you add, so the selling price and margin are worked out before you quote. When the numbers are right, make the quotation the customer sees from it.

  1. Open Estimates and press New estimate
  2. Give what it is for, the customer, the site and the tax percentage
  3. Add each line with quantity, cost per unit and markup
  4. Check the margin across the estimate
  5. Make the quotation from it and send it

Questions

  • An estimate is an approximate cost to plan with; a quotation is a firm offer the customer accepts, with terms and a validity date.

Related formats

Related guides

  • Construction BOQ format

    What a bill of quantities (BOQ) is, the columns it has, the units used for each trade in India, a sample BOQ, and how a BOQ differs from an estimate and a quotation..

  • Interior design quotation format

    A complete interior design quotation format for India.

Run an interior or turnkey business?

Inbecto turns a design into a priced quotation, sends it to the client to approve, and carries it through the project to the GST invoice and payment.

Try Inbecto free