Construction quotation format
By the Inbecto team · Updated
A construction quotation prices a building job either per sq.ft of built-up area (a package rate with a specification) or item by item from a BOQ: concrete in cubic metres, steel by the kg, masonry, plaster and flooring by area. Either way it needs a clear specification, exclusions, stage-wise payments and GST. Standard house construction is typically ₹1,800 to ₹2,800 per sq.ft (approximate, Nov 2026).
Free, no sign-up. Filled with the sample below: change it to your own details. In the Excel file the amounts and totals are formulas.
When you need it
- Building a house or a floor for a plot owner
- A builder or developer asks for your rates
- Extra floors, extensions or structural work
What to include
| Field | What goes in it |
|---|---|
| Basis | Per sq.ft of built-up area, or item rate from a BOQ. |
| Specification | Concrete grade, steel grade and brand, cement, bricks or blocks. |
| Items | Description, quantity, unit, rate, amount. |
| Exclusions | Approvals, soil test, interiors, fittings, boundary works. |
| Stage payments | Booking, plinth, each slab, brickwork, finishing. |
| Time and GST | Months to finish; GST at 18% on works contracts. |
Sample construction quotation format
QUOTATION
House construction, ground and first floor
From
Shree Windows & Interiors
Plot 18, Sector 37, Gurugram, Haryana 122001
GSTIN 06ABCPS1234K1Z8 · Phone 98110 00000
To
Vikram Yadav
Plot 214, Sector 45, Gurugram 122003
- Quotation no.:
- Q-0436
- Date:
- 14 Nov 2026
- Valid until:
- 14 Dec 2026
- Time:
- 10 months from the plinth
| Sr | Description | Qty | Unit | Rate (₹) | Amount (₹) |
|---|---|---|---|---|---|
| 1 | Ground floor, RCC frame, standard specification (attached) | 1,450 | sq.ft | 2,100.00 | 30,45,000.00 |
| 2 | First floor, same specification | 1,450 | sq.ft | 2,100.00 | 30,45,000.00 |
| 3 | Stair cabin and parapet | 220 | sq.ft | 1,600.00 | 3,52,000.00 |
| 4 | Boundary wall, 5 ft high, brick with plaster | 120 | rft | 1,200.00 | 1,44,000.00 |
| 5 | Underground water tank, 10,000 litres, RCC | 1 | Nos | 1,10,000.00 | 1,10,000.00 |
| Taxable value | 66,96,000.00 | ||||
| CGST 9% | 6,02,640.00 | ||||
| SGST 9% | 6,02,640.00 | ||||
| Total | 79,01,280.00 | ||||
Amount in words: Rupees Seventy Nine Lakh One Thousand Two Hundred Eighty Only
Specification
M20 concrete, Fe 500D steel, PPC or OPC 53 cement of an agreed brand, red brick or AAC block walls.
Payments
10% booking, 15% at plinth, 15% at each slab, 20% after brickwork, 15% after plaster, 10% at handover.
Not included
Approvals, soil test, interiors, electrical and sanitary fittings. Sample rates for illustration only. Rates vary by city, brand and site.
Customer acceptance (name, sign, date)
For Shree Windows & Interiors
Typical rates
| Work | Unit | Typical rate |
|---|---|---|
| House construction, basic finish | sq.ft built-up | ₹1,400 to ₹1,800 |
| House construction, standard finish | sq.ft built-up | ₹1,800 to ₹2,800 |
| House construction, premium finish | sq.ft built-up | ₹2,800 to ₹5,000 |
| Metro cities, standard finish | sq.ft built-up | ₹2,200 to ₹4,500 |
Typical ranges, approximate. Rates vary by city, brand and site. Updated Nov 2026.
Make this in Inbecto
Quotations (Turnkey), then Projects
Inbecto quotes turnkey and construction work from your price list, with each product's calculation method deciding the sizes it asks for. Once accepted, the quotation becomes a project with scope, milestones and payment stages; running bills charge the work done to date, and project costing shows profit as costs come in.
- Add your items with units and rates to the price list
- Make the quotation with Measure a room or from a pasted BOQ
- Set stage-wise payment terms and send it
- On acceptance, press Create project
- Bill work done to date with running bills