Civil work quotation format

By the Inbecto team · Updated

A civil work quotation is an item-rate list: demolition, brickwork, plaster, waterproofing, flooring and tiling, each with a specification, unit, quantity, rate and amount, followed by debris removal, exclusions, time, payment terms and GST. Say on every line whether the rate includes material. Internal cement plaster with material is typically ₹25 to ₹35 per sq.ft (approximate, Nov 2026).

Free, no sign-up. Filled with the sample below: change it to your own details. In the Excel file the amounts and totals are formulas.

When you need it

  • Bathroom and kitchen renovations
  • New partitions, plaster and flooring in a flat or office
  • Civil work before an interior job

What to include

Fields of the civil work quotation format
FieldWhat goes in it
Item and specificationSuch as 12 mm cement plaster in CM 1:6.
Unitsq.ft, rft, cum, Nos or lot.
Quantity, rate and amountMeasured on site or from drawings.
MaterialWho supplies tiles, cement and sand.
DebrisRemoval and where it goes.
Time, payment and GSTDays, stages, 18% GST.

Sample civil work quotation format

QUOTATION

Civil work, two bathrooms and a partition

From

Shree Windows & Interiors

Plot 18, Sector 37, Gurugram, Haryana 122001

GSTIN 06ABCPS1234K1Z8 · Phone 98110 00000

To

Sunita Rao

Flat 704, Palm Residency, Sector 49, Gurugram

Quotation no.:
Q-0440
Date:
14 Nov 2026
Valid until:
29 Nov 2026
Time:
18 working days
Sample civil work quotation format lines
SrDescriptionQtyUnitRate (₹)Amount (₹)
1Break and remove old floor and wall tiles, two bathrooms280sq.ft22.006,160.00
24.5 in brick wall in CM 1:4 for new partition96sq.ft120.0011,520.00
312 mm internal cement plaster in CM 1:6, both faces192sq.ft30.005,760.00
4Bathroom waterproofing, polymer coating, floor and 1 ft up walls150sq.ft65.009,750.00
5Tiles laid with adhesive (tiles by client)420sq.ft55.0023,100.00
6Debris removal to an approved dump1Lot6,500.006,500.00
Taxable value62,790.00
CGST 9%5,651.10
SGST 9%5,651.10
Total74,092.20

Amount in words: Rupees Seventy Four Thousand Ninety Two and Twenty Paise Only

Terms

Rates include material unless the line says otherwise. Water and power by the client.

Payment: 30% to start, 40% after waterproofing, 30% on completion.

Sample rates for illustration only. Rates vary by city, brand and site.

Customer acceptance (name, sign, date)

For Shree Windows & Interiors

Sample data, for illustration. Names, GSTINs and rates are made up.

Typical rates

Typical civil work rates
WorkUnitTypical rate
Internal cement plaster, with materialsq.ft₹25 to ₹35
External plaster, with materialsq.ft₹30 to ₹45
Internal plaster, labour onlysq.ft₹10 to ₹18
4.5 in brick wall, with materialsq.ft of wall₹80 to ₹140
9 in brick wall, with materialsq.ft of wall₹110 to ₹200
Tiling, labour onlysq.ft₹25 to ₹60

Typical ranges, approximate. Rates vary by city, brand and site. Updated Nov 2026.

Make this in Inbecto

Quotations (Turnkey) and Work orders

Inbecto quotes civil work item by item from your price list: Measure a room works out walls, floor and ceiling from a room's size, and Paste a list adds a whole BOQ at once. After acceptance, give the work to masons and tilers with work orders, certify what they finish, and bill the client with running bills.

  1. Add civil items with their units and rates to your price list
  2. Make the quotation with Measure a room or Paste a list
  3. Send it on WhatsApp for the customer to accept
  4. Give work to subcontractors with work orders
  5. Certify measured work and raise running bills

Questions

  • Work on the structure and surfaces: demolition, brick or block walls, plaster, waterproofing, flooring, tiling and the debris it makes. Interiors and fittings come after.

Related formats

Related guides

  • Construction BOQ format

    What a bill of quantities (BOQ) is, the columns it has, the units used for each trade in India, a sample BOQ, and how a BOQ differs from an estimate and a quotation..

  • Interior design quotation format

    A complete interior design quotation format for India.

Run an interior or turnkey business?

Inbecto turns a design into a priced quotation, sends it to the client to approve, and carries it through the project to the GST invoice and payment.

Try Inbecto free