Work order format for contractors and subcontractors
By the Inbecto team · Updated
A work order is the written instruction you give a contractor or subcontractor to do a defined job at agreed rates: the scope, each item with unit, quantity and rate, start and finish dates, who supplies material, payment against measured work, retention, and penalties for delay. Both sides sign it. Download the work order format as Excel to fill in, or as a PDF.
Free, no sign-up. Filled with the sample below: change it to your own details. In the Excel file the amounts and totals are formulas.
When you need it
- You give part of a project to a subcontractor: ceiling, painting, tiling, electrical
- You hire a labour contractor at a rate per sq.ft or per point
- A client gives you work and you want the scope and rates in writing
What to include
| Field | What goes in it |
|---|---|
| Work order number and date | One series, so payments can refer to it. |
| Contractor | Name, address, phone, GSTIN if registered, and PAN. |
| Project and site | Where the work is. |
| Scope and items | Description, unit, quantity, rate and amount. |
| Material | Which material you supply and which the contractor brings. |
| Dates | Start and finish, and the penalty for delay if any. |
| Measurement and billing | Running bills on measured work, how soon they are paid. |
| Retention | Percent held from each bill, and when it is released. |
| TDS | Deducted under Section 194C: 1% for an individual or HUF, 2% for others. |
| Safety and labour | Wages, PF and ESI are the contractor's. |
| Signatures | Yours and the contractor's acceptance. |
Sample work order format
WORK ORDER
Issued by
Shree Windows & Interiors
Plot 18, Sector 37, Gurugram, Haryana 122001
GSTIN 06ABCPS1234K1Z8 · Phone 98110 00000
Contractor
Rajesh Kumar, ceiling and painting contractor
Village Wazirabad, Sector 52, Gurugram 122003
GSTIN 06AKRPK1234D1Z2 · PAN AKRPK1234D
- Work order no.:
- WO/26-27/014
- Date:
- 14 Nov 2026
- Project:
- Kapoor Advisory LLP office, Okhla Phase III, New Delhi
- Start / finish:
- 18 Nov 2026 / 10 Dec 2026
| Sr | Description | Qty | Unit | Rate (₹) | Amount (₹) |
|---|---|---|---|---|---|
| 1 | Gypsum false ceiling, fixing only (boards and channels by us) | 1,200 | sq.ft | 30.00 | 36,000.00 |
| 2 | Putty 2 coats, primer, 2 coats emulsion, labour only | 2,800 | sq.ft | 12.00 | 33,600.00 |
| 3 | Enamel on doors and frames, labour only | 180 | sq.ft | 18.00 | 3,240.00 |
| Taxable value | 72,840.00 | ||||
| CGST 9% | 6,555.60 | ||||
| SGST 9% | 6,555.60 | ||||
| Total | 85,951.20 | ||||
Terms
Material: gypsum boards, channels, putty, primer and paint by us. Tools, scaffolding and labour by the contractor.
Billing: a running bill every two weeks on measured work, paid within 10 days of certification.
Retention: 5% of each bill, released three months after handover if there are no defects.
TDS deducted under Section 194C. Delay: ₹500 a day after the finish date, up to 5% of the order value.
Accepted by contractor
For Shree Windows & Interiors
Make this in Inbecto
Work orders
Inbecto's Work orders give work to a subcontractor at agreed rates: the subcontractor, project, scope, value, rate basis and retention. As work is done you certify the measured quantity, and pay against it; the work order keeps the order value, certified, retention held and balance due, and the money owed shows on the project's Site tab.
- Open Work orders and press New work order
- Choose the subcontractor, the project and the dates
- Give the value, rate basis (such as per sq.ft), retention % and the scope
- As work finishes, press Certify work with the measured quantity
- Pay what is due and press Mark paid